Varman Aviation Pvt Ltd

Dynamometer

₹ 90000.00  Incl. GST/Nos ₹ 76271.19 Excl. GST

Description

The infrastructure includes technically modern Test Bed with Dynamometer and sophisticated NDT lab with both fluorescent dye inspection technique as well as Magnaflux under ultraviolet light.
 
The test benches for other engine accessories 
like Injector, Carburetors, Alternators, Starters and Magneto are specially designed and manufactured. VAP has acquired the latest technically updated Test Bed and adopted modern technique of testing the engine with a pre-calibrated dynamometer. Test run of Engines ensures correct piston ring seating and measures and records engine torque & horse power Output.

Engine receive an average of 2 hours test run to achieve proper cylinder compression and complete operation information of performance prior to return to service.

Dynamometer

Product ID (MPN): ITB-C36082C1
Availability:In Stock
₹ 90000.00  Incl. GST ₹ /Nos
Brand Name Varman Aviation Pvt Ltd
Model ITB-C36082C1
Condition New
Unit Type Nos
Minimum Order Quantity 1
Minimum Ordered Packs 1
Country of Origin India
Taxes Inclusive of Tax
Ships from Bengaluru
Shipping Product eligible for free shipping
Returnable 7 Days Return
Warranty Type Manufacturer / Seller
Warranty Not Applicable
SELLER INFORMATION
Varman Aviation Pvt Ltd
Business Address
Aviation Complex, 16-17, Road No. 7, EPIP, Whitefield , Bengaluru Karnataka-560066
  • Description
    The infrastructure includes technically modern Test Bed with Dynamometer and sophisticated NDT lab with both fluorescent dye inspection technique as well as Magnaflux under ultraviolet light.
     
    The test benches for other engine accessories 
    like Injector, Carburetors, Alternators, Starters and Magneto are specially designed and manufactured. VAP has acquired the latest technically updated Test Bed and adopted modern technique of testing the engine with a pre-calibrated dynamometer. Test run of Engines ensures correct piston ring seating and measures and records engine torque & horse power Output.

    Engine receive an average of 2 hours test run to achieve proper cylinder compression and complete operation information of performance prior to return to service.