| Briquettes Diameterr | 90mm | |
| Briquettes Length | 100mm/500mm | |
| Prodution Capacity | 1500Kg./hr* | |
| Finished Product Shape: | Cylindrical | |
| Process Cost / MT (Approx) | Rs. 500/- (In India) | |
| Specifications of applicable Raw Material (any agro waste) & Other infrastructure | ||
| Raw Material Size | 20mm Maximum | |
| Maisture Content of Raw Material | Max 10% | |
| If bigger size of Raw Material, Hammer Mill required. Moisture contain | Max 10% | |
| If moisture contain is higher than dryer is required. | ||
| Land Area In Feet (Machine Room) | 20' x 30' x 14' (Widht x Length x Height) Electricity / Power | |
| Minimum Total Land require for whole plant [Machine area / Raw materials area] 5000 Mtr [Approx] Electricity / Power | ||
| Required Power Connection | 90 hp (III phase) | |
| Practical used Amp. Load | 80- 90Amp (Approx) | |
| Power Consumption | 35-40 Unit/ Tone | |
| Labor | ||
| Trained & Skilled operator | One/shift | |
| Unskilled labor | Six/Shift. | |
| Total weight of complite Unit | 8500kg. (Approx) | |
| Require one 20feet container | ||
| total size of complete unit | 20' x 30' x 14' (Widht x Length x Height)approx Production Data with Various Raw Materials (Approx | |
| Sugarcane Baggasse /saybean husk | 800/ 900Kg./ hr. | |
| Groundnut Shell | 1200-1500Kg. / hr. | |
| Saw Dust/Wood Chips / Coconut Shell | 1200 - 1600Kg./Hr. | |
| Briquettes Diameterr | 90mm | |
| Briquettes Length | 100mm/500mm | |
| Prodution Capacity | 1500Kg./hr* | |
| Finished Product Shape: | Cylindrical | |
| Process Cost / MT (Approx) | Rs. 500/- (In India) | |
| Specifications of applicable Raw Material (any agro waste) & Other infrastructure | ||
| Raw Material Size | 20mm Maximum | |
| Maisture Content of Raw Material | Max 10% | |
| If bigger size of Raw Material, Hammer Mill required. Moisture contain | Max 10% | |
| If moisture contain is higher than dryer is required. | ||
| Land Area In Feet (Machine Room) | 20' x 30' x 14' (Widht x Length x Height) Electricity / Power | |
| Minimum Total Land require for whole plant [Machine area / Raw materials area] 5000 Mtr [Approx] Electricity / Power | ||
| Required Power Connection | 90 hp (III phase) | |
| Practical used Amp. Load | 80- 90Amp (Approx) | |
| Power Consumption | 35-40 Unit/ Tone | |
| Labor | ||
| Trained & Skilled operator | One/shift | |
| Unskilled labor | Six/Shift. | |
| Total weight of complite Unit | 8500kg. (Approx) | |
| Require one 20feet container | ||
| total size of complete unit | 20' x 30' x 14' (Widht x Length x Height)approx Production Data with Various Raw Materials (Approx | |
| Sugarcane Baggasse /saybean husk | 800/ 900Kg./ hr. | |
| Groundnut Shell | 1200-1500Kg. / hr. | |
| Saw Dust/Wood Chips / Coconut Shell | 1200 - 1600Kg./Hr. | |