JRMS Engineering Works

Underground Sewage Treatment Plant

₹ 1650000.00  Incl. GST ₹ 1398305.08 Excl. GST

Description

Package Sewage Treatment Plant of Fiber glass reinforced Plastic (FRP) tank made by filament winding process from suitable polyester resin and glass fiber of the tank with suitable polyester resin and fiber glass to make tank suitable for underground application process variation. The tank to have three zones – first zone to work as anaerobic septic zone created with suitable partition of FRP; second zone to be created by partition of FRP with advanced fab media with a surface area to volume ratio of minimum of 400 Sq. Mtr / Cubic meter suitably encased free movement of the media within fixed space created by the net; the third zone to work as sedimentation zone in the remainder area of the tank. Aerobic zone have Twin Lobe Air Blowers installed for providing air flow coarse aeration in the zone for speedy reduction of BOD. Sedimentation zone have submersible pump of the for pumping the activated sludge back to the anaerobic zone by way of PVC pipes The whole plant to be controlled by automatic control panel made from sheet molded compound
Product Details:
Air Blower Power 5 kW
Feed Flow Rate (cubic-meter/day) 50 m3/day
Impurities to be removed Dissolved Minerals, Turbidity, Oil and Grease
Approximate Power Consumption (in kW) 10 kW
Installation Type Prefabricated, Completes Civil work with Installation
Overall Dimensions 2500 X 11000 mm
Air Blower Count 2
Approximate Power Consumption 7.5 kW
Brand JRMS
SELLER: JRMS Engineering Works

Underground Sewage Treatment Plant

Product code (MPN): ITB-75152D8A
Availability:In Stock
₹ 1650000.00  Incl. GST ₹ 1398305.08 Excl. GST
  • Description
    Package Sewage Treatment Plant of Fiber glass reinforced Plastic (FRP) tank made by filament winding process from suitable polyester resin and glass fiber of the tank with suitable polyester resin and fiber glass to make tank suitable for underground application process variation. The tank to have three zones – first zone to work as anaerobic septic zone created with suitable partition of FRP; second zone to be created by partition of FRP with advanced fab media with a surface area to volume ratio of minimum of 400 Sq. Mtr / Cubic meter suitably encased free movement of the media within fixed space created by the net; the third zone to work as sedimentation zone in the remainder area of the tank. Aerobic zone have Twin Lobe Air Blowers installed for providing air flow coarse aeration in the zone for speedy reduction of BOD. Sedimentation zone have submersible pump of the for pumping the activated sludge back to the anaerobic zone by way of PVC pipes The whole plant to be controlled by automatic control panel made from sheet molded compound
    Product Details:
    Air Blower Power 5 kW
    Feed Flow Rate (cubic-meter/day) 50 m3/day
    Impurities to be removed Dissolved Minerals, Turbidity, Oil and Grease
    Approximate Power Consumption (in kW) 10 kW
    Installation Type Prefabricated, Completes Civil work with Installation
    Overall Dimensions 2500 X 11000 mm
    Air Blower Count 2
    Approximate Power Consumption 7.5 kW
    Brand JRMS
  • FAQs
    Need some help? Ask us!